[EXPIRED] 3-Hour Closure, October 17, Alfred A. Cunningham Bridge, Trent River, New Bern NC
NC ‘“ NEUSE RIVER AND UPPER PART OF BAY RIVER ‘“ BRIDGE CLOSURE
Mariners are advised that openings of the U.S. 70 (Alfred C. Cunningham) Bridge over Trent River, mile 0.0, at New Bern, NC will be reduced due to the 2015 Neuse River Bridge Run. The drawbridge will be maintained in the closed-to-navigation position from 6:30 a.m. to 9:30 a.m. on October 17, 2015. At all other times, the drawbridge will operate in accordance with the operating regulation in 33 CFR 117.843(a). The vertical clearance above mean high water in the closed-to-navigation position is 14 feet. Vessels able to pass through the bridge in the closed-tonavigation position may do so at anytime. Mariners should approach the drawbridge with caution.
Chart 11552 LNM 40/15
Click Here To Open A Chart View Window, Zoomed To the Location of Cunningham Bridge
Be the first to comment!