[EXPIRED] 4-Hour Closure for SR 74 Bridge in Wrightsville Beach, NC, October 25, 2014, AICW Statute Mile 283.1
With a closed vertical clearance of 20ft, and a very restrictive opening schedule, the Wrightsville Beach Bascule Bridge crosses the AICW at Statute Mile 283, southwest of marker #125.
NC ‘“ ATLANTIC INTRACOASTAL WATERWAY (AICW) ‘“ CAPE FEAR RIVER – NORTHEAST CAPE FEAR RIVER
Mariners are advised that revised closure times were approved to accommodate the annual Beach2Battleship Iron and ½ Iron Triathlons scheduled on Saturday, October 25, 2014 at the S.R. 74 Bridge, across the AICW mile 283.1, at Wrightsville Beach, NC and at the Isabel S. Holmes Bridge across Northeast Cape Fear River, at mile 1.0, at Wilmington, NC. The drawbridges will now be allowed to be closed to vessels at the following times: at the S.R. 74 Bridge from 7 a.m. to 11 a.m.; and at the Isabel S. Holmes Bridge from 10 a.m. to 6 p.m. At all other times, the drawbridges will operate in accordance with the operating regulations at 33 CFR Parts 117.821(a) (6) and at 117.829 (a), respectively. Mariners should approach these drawbridges with caution. Chart 11537 LNM:41/14
Click Here To View the Cruisers’ Net’s North Carolina Bridge Directory Listing For SR 74 Bridge
Click Here To Open A Chart View Window, Zoomed To the Location of SR 74 Bridge
Be the first to comment!