Chart View Search

Search Waterway by Nautical Mile

Select Waterway:
Statute Mile:

(Min: 0nm Max: 1095nm)

Search by Latitude/Longtitude

Degrees/Minutes/Decimal Minutes Format
Degrees/Decimal Degrees Format
(Degrees/Decimal Degrees Format Only)

Deg:   Min/Dec. Min:   

Deg:   Min/Dec. Min:   

(Degrees/Minutes/Decimal Minutes Format Only)

The Salty Southeast
Cruisers' Net
Cruisers Helping Cruisers

Dredging of the Salt Ponds in the Lower Chesapeake

Salt Ponds lies on the western shore of the lower Chesapeake and is the southern-most protected water on the western shore outside Hampton Roads. The entrance is a narrow, perpendicular-to-the shore channel and appears quite daunting on first approach, but once inside the waters are very protected from all directions.

Dredging started today January 16, 2011 on the channel for The Salt Ponds and Long Creek in Hampton, VA. The channel is now passable at all tides for vessels with 5′6″ draft or less. Yet when the dredging is completed by mid February the controlling depth will be 8′ at MLW.
Nonnie Minga
The dredge JENNI LEA will be conducting dredging operations in Salt Ponds Channel from 12 January until 12 February, 2011. The dredge and assisting vessels DANNY JOE and MISS LEANNE will monitor VHF-FM Channels 13, 16 and 78. A floating and submerged pipeline will traverse the channel and deposit dredge material on the south side of the inlet. Mariners are cautioned to stay clear of dredge, booster, floating (pontoon) and submerged pipelines, barges, derricks and operating wires associated with dredging and marine construction operations. Operators of vessels of all types should be aware that dredges and floating pipelines are held in place by cables, attached to anchors some distance away from the equipment. Buoys are attached to the anchors so that the anchors may be moved as the dredge advances and the location of the submerged pipelines are marked by buoys on each side of the channel. Mariners are cautioned to strictly comply with the Inland Rules of the Road when approaching, passing and leaving the area of operations, and remain a safe distance away from the dredge, booster, buoys, cables, pipeline, barges, derricks, wires and related equipment. Owners and lessees of fishnets, crabpots and other structures that may be in the vicinity and that may hinder the free navigation of attending vessels and equipment must be remove these from the area where tugs, tenderboats and other attendant equipment will be navigating. Dredging projects are usually conducted twenty-four (24) hours a day seven (7) days a week, all fishnets, crabpots and structures in the general area must be removed prior to commencement of any work. A NO WAKE transit is requested by all transiting vessels. Chart : 12222.

Click Here To Open A Chart View Window, Zoomed To the Location of Salt Ponds

Add your comment to this discussion:

Your email address will not be published. Required fields are marked (required). All "Comments/Reviews" submitted to the Salty Southeast Cruisers' Net are reviewed by our editorial staff before being published.

Click here to submit cruising news
Click Here To Join The Cruisers' Net Alert List
Enter your email address below to sign up for our Salty Southeast Cruisers' Alert List and receive notices of breaking news that affects the cruising community from North Carolina to New Orleans!
Cruising News and Reference Directories
Boat Broker Partners