    • [EXPIRED] Dredging Underway, Intersection of AICW and St. Marys River, Statute Mile 714


      Dredge equipment and barge traffic between Kings Bay and the ocean disposal site will impact Waterway traffic through Fernandina Harbor.

      GEORGIA AND FLORIDA ‘“ CUMBERLAND SOUND ‘“ FERNANDINA HARBOR TO KINGS BAY – U.S. NAVAL STATION KINGS BAY:
      Maintenance Dredging Entrance Channel CUT-1N through Range E.

      Great Lakes Dredge & Dock Company will conduct dredge operations in the Kings Bay Entrance Channel on approximately January 20, 2016. The project consists of excavating material from the entrance channel and disposing at Fernandina Ocean Disposal Area, Nearshore Disposal Area and pumping material to North Fernandina Beach. Dredges TERRAPIN ISLAND and LIBERTY ISLAND along with Survey Vessel DIAMOND GIRL, Tugs COASTAL DAWN and SUMMER STAR, Derrick MB1800, Anchor Barge KAZ1, Booster REGGIE and Survey/Launch Vessel DIAMOND GIRL. The Derrick Mobro1800 with assistance from the Tug COASTAL DAWN, Tug SUMMER STAR, and Anchor Barge KAZ1 will be placing submerged pipeline, floating line, and a cube assembly from the pump off location(see coordinates below) to the Fort Clinch Fishing Pier. The Booster REGGIE will be spudded down and connected to the submerged line approximately 1600ft from shore. All pipelines will be placed outside of the navigation channel. During daylight hours, a small launch vessel may be conducting survey operations perpendicular to the channel. Mariners are advised to pass the vessels stern and provide a slow bell. All unused pipe and equipment will be staged in the St. Mary’s River, east of Little Tiger Island, outside the navigation channel. Starting approximately 01 February dredges TERRAPIN ISLAND and LIBERTY ISLAND will excavate material from Kings Bay Entrance Channel at STA 250+00 to 48+242 at Naval Station Kings Bay, between St Marys River DBN 12 (LLNR 6820) and Kings Bay Light 62 (LLNR 7040) and bottom disposing at the Fernandina Ocean Disposal Area, Nearshore Disposal Area and pumping on the Fernandina Beach (see coordinates below). The vessels will monitor VHF Channels 13 & 16, 24 hours per day, 7 days a week until approximately March 31, 2016. GLDD POC (Site Manager) Matt Ferrell 630-248-4078 or Katherine Mason (Project Manager) 630-207-7437. Mariners are urged to exercise extreme caution while transiting the area.
      Fernandina Ocean Disposal Coordinates:
      30° 33’00.8698N 81° 19’07.1136W
      30° 33’00.8679N 81° 16’51.5106W
      30° 31’00.8622N 81° 16’51.5017W
      30° 31’00.8635N 81° 19’07.1041W
      Nearshore Disposal Coordinates:
      30° 37’28.0878N 81° 25’08.3800W
      30° 37’27.7553N 81° 24’11.1557W
      30° 36’18.0790N 81° 24’11.7025W
      30° 36’18.8022N 81° 25’08.9125W
      Pump off Location:
      30° 42’31.3985N 81° 25’20.3995W
      Booster Reggie:
      30° 41’23.5274N 81° 27’57.0155W
      Chart 11503 LNM 4/16