The Town of Marineland has opened its ports with a brand new marina facility creating a destination for boaters on the Intracoastal Waterway between Daytona Beach and St. Augustine, FL.Welcome to Camachee Cove Yacht Harbor! Located in America’s oldest city- St. Augustine, Florida- Camachee Cove is a fully protected marina adjacent to the ICW, and less than a mile from the St. AugusVero Beach MarinaNew Smyrna Beach Marina, 201 N. Riverside Drive, New Smyrna Beach, FL 32168, 386-409-2042Amelia Island Yacht Basin - Marina and Boat Yard - Amelia Island FloridaFULL MARINE SERVICE ON SITE TRANSIENT DOCKAGE WELCOME
 Fort Pierce City Marina 1 Avenue A, Ft. Pierce, FL 34950 Toll Free (800) 619-1780 (772) 464-1245 Facsimile (772) 464-2589Guest Coupon Available On Our Web Site Hammock Beach Resort & MarinaFernandina Harbor Marina Welcome to the Staniel Cay Yacht Club, your own paradise in the middle of the beautiful Exumas.451 Marina Rd., Titusville, FL 32796, Phone: 321-383-5600, Fax: 321-383-5602, Contact: Joe Stone General Manager, Hours: 8:00 am - 1:00 am, Groceries within walking distance  , Restaurants nearby  , 5 minutes from Merritt Island Wildlife Refuge  , 10 minutes from Canaveral National Seashore  , 20 minutes from Kennedy Space Center  , 1 hour from Orlando Attractions , Transient Moorings in Miami at Coconut Grove Sailing Club, 24 hour launch & security, Short walk to Coconut Grove, Daily & Monthly Rates
(305)-444-4571 EXT  16, manager@cgsc.orgWestland Marina is located on the Intracoastal Waterway in Titusville, Florida. Near Cape Canaveral, Port Canaveral, Merritt Island and Cocoa Beach

Lantana Avenue Bridge

Posted by admin | Posted on 03-28-2007

Lantana Avenue Bridge-crosses the ICW at Statute Mile 1031, south of unlighted daybeacon #38
26 35.052 North/080 02.733 West
 Bascule
12 feet closed vertical clearance
Restricted opening
VHF Hailing Channel 9
Opens on the hour and half hour, 24 hours a day, 365 days a year

The Lantana Avenue drawbridge with a closed vertical clearance of 12ft was closed to roadway traffic on March 18 and will be replaced with a new drawbridge with a vertical clearance of 21ft reducing the required openings by 40 percent. The new bridge is scheduled to be completed in November of 2013.

 

Add your comment to this discussion:

All "Comments/Reviews" submitted to the Salty Southeast Cruisers' Net are reviewed by our editorial staff before being published.