Vero Beach MarinaAmelia Island Yacht Basin - Marina and Boat Yard - Amelia Island FloridaNew Smyrna Beach Marina, 201 N. Riverside Drive, New Smyrna Beach, FL 32168, 386-409-2042FULL MARINE SERVICE ON SITE TRANSIENT DOCKAGE WELCOME The Town of Marineland has opened its ports with a brand new marina facility creating a destination for boaters on the Intracoastal Waterway between Daytona Beach and St. Augustine, FL.Welcome to Camachee Cove Yacht Harbor! Located in America’s oldest city- St. Augustine, Florida- Camachee Cove is a fully protected marina adjacent to the ICW, and less than a mile from the St. Augus
451 Marina Rd., Titusville, FL 32796, Phone: 321-383-5600, Fax: 321-383-5602, Contact: Joe Stone General Manager, Hours: 8:00 am - 1:00 am, Groceries within walking distance  , Restaurants nearby  , 5 minutes from Merritt Island Wildlife Refuge  , 10 minutes from Canaveral National Seashore  , 20 minutes from Kennedy Space Center  , 1 hour from Orlando Attractions , Hammock Beach Resort & Marina Welcome to the Staniel Cay Yacht Club, your own paradise in the middle of the beautiful Exumas.Westland Marina is located on the Intracoastal Waterway in Titusville, Florida. Near Cape Canaveral, Port Canaveral, Merritt Island and Cocoa BeachFernandina Harbor MarinaGuest Coupon Available On Our Web Site  Fort Pierce City Marina 1 Avenue A, Ft. Pierce, FL 34950 Toll Free (800) 619-1780 (772) 464-1245 Facsimile (772) 464-2589Transient Moorings in Miami at Coconut Grove Sailing Club, 24 hour launch & security, Short walk to Coconut Grove, Daily & Monthly Rates
(305)-444-4571 EXT  16, manager@cgsc.org

Lantana Avenue Bridge

Posted by admin | Posted on 03-28-2007

Lantana Avenue Bridge-crosses the ICW at Statute Mile 1031, south of unlighted daybeacon #38
26 35.052 North/080 02.733 West
 Bascule
12 feet closed vertical clearance
Restricted opening
VHF Hailing Channel 9
Opens on the hour and half hour, 24 hours a day, 365 days a year

The Lantana Avenue drawbridge with a closed vertical clearance of 12ft was closed to roadway traffic on March 18 and will be replaced with a new drawbridge with a vertical clearance of 21ft reducing the required openings by 40 percent. The new bridge is scheduled to be completed in November of 2013.

 

Add your comment to this discussion:

All "Comments/Reviews" submitted to the Salty Southeast Cruisers' Net are reviewed by our editorial staff before being published.