[EXPIRED] 8 Hour Closure, Great Bridge Lock, December 7, 2016, AICW Statute Mile 11.5, 11/29/2016
Great Bridge Lock will close to vessel traffic for maintenance work on December 7 from 7:00 AM to 3:00 PM. Plan accordingly!
****VA – ATLANTIC INTRACOASTAL WATERWAY, ALBEMARLE AND CHESAPEAKE CANAL – TEMPORARY CLOSURE GREAT BRIDGE LOCK****
The Great Bridge Lock, Albemarle and Chesapeake Canal mile marker 12.2, Atlantic Intracoastal Waterway located in Chesapeake, Virginia, will be closed to navigation on Wednesday December 7, 2016 between 7:00 AM and 3:00 PM. The Albemarle and Chesapeake Canal, Route 1 of the Atlantic Intracoastal Waterway, will be closed to through vessel traffic during the time period. Closure is required to facilitate diving and crane operations to remove and replace a damaged lock valve stem. Vessel operators may contact Mr. Joel Scussel at 757-201-7642 regarding the latest project conditions or the Albemarle and Chesapeake Canal closure. Lock and bridge operators will monitor Channel 13. Chart 12252 LNM 48/16
Click Here To View the Cruisers’ Net’s NC-VA Bridge Directory Listing For Great Bridge Lock
Click Here To Open A Chart View Window, Zoomed To the Location of Great Bridge Lock
Be the first to comment!