Chart View Search

Search Waterway by Nautical Mile

Select Waterway:
Statute Mile:

(Min: 0nm Max: 1095nm)

Search by Latitude/Longtitude

Degrees/Minutes/Decimal Minutes Format
Degrees/Decimal Degrees Format
Latitude:
Longitude:
(Degrees/Decimal Degrees Format Only)

Latitude:
Deg:   Min/Dec. Min:   

Longitude:
Deg:   Min/Dec. Min:   

(Degrees/Minutes/Decimal Minutes Format Only)

Close
Salty Southeast
Cruisers' Net
Cruisers Helping Cruisers

Shem Creek Dredging near AICW Intersection, Lower Charleston (SC) Harbor, Statute Mile 463

AICW/Shem Creek Intersection - Click for Chartview

Shem Creek, a popular DINING destination for cruisers, is found on the lower, north side of Charleston Harbor. The LONG entrance channel intersects the Waterway at marker #130.
FINALLY, the channel into Shem Creek from Charleston Harbor is being dredged. When complete, cruisers should once again discover good depths all the way into the southern mouth of Shem Creek, and it’s then just a hop, skip and a jump to the several restaurants on this stream which feature dockage for their patrons (particularly “RB’s”).
The initial dredging already underway is found north of #130 between markers #1 and #2, and will progress northward into Shem Creek. Waterway navigation should not be affected by the dredging operations.

SOUTH CAROLINA-CHARLESTON HARBOR-LOWER CHARLESTON HARBOR-SHEM CREEK: Dredge Operations
Cottrell contracting Corp will commence dredge operations approximately January 1, 2014 in the Lower Charleston Harbor in Shem Creek beginning 1300 feet south of Mount Pleasant Channel DBN 1 (LLNR 3510) and DBN 2 (LLNR 3515) and progressing northward to the Coleman Boulevard Bridge. Associated dredge pipeline operations will be present west of Charleston Harbor Channel LB 23 (LLNR 2465) and LB 24 (LLNR 2470) on the Mount Pleasant Range, Rebellion reach and South Channel of the Lower Charleston Harbor. The Dredge RICHMOND will be on scene and monitoring VHF channels 13 & 16. Submerged and floating pipeline will be used during the dredge operations. Mariners are advised to stay clear of the dredge, pipelines, barge, derricks and operating wires about the dredge. The dredge and pontoon lines are held in place by cables attached to anchors some distance from the dredge and pontoons. Buoys may move as the dredge moves. Owners and lessees of fishnets, crab pots and other structures that may be in the vicinity and that may hinder the free navigation of attending vessels and equipment must remove these from the area where tugs, tender boats and other attendant equipment will be navigating. Dredge Operations will be conducted 24/7 until approximately April 1, 2014. Mariners are advised to transit at the slowest safe speed a slow NO WAKE speed is requested, and proceed with caution after passing arrangements have been made with the dredge. Project POC: Shannon Wolf (757) 547-9611.
Chart 11524 LNM: 01/14

Click Here To Open A Chart View Window, Zoomed To the Location of AICW/ Shem Creek Intersection

Add your comment to this discussion:

Your email address will not be published. Required fields are marked (required). All "Comments/Reviews" submitted to the Salty Southeast Cruisers' Net are reviewed by our editorial staff before being published.

Cruising News and Reference Directories
Boat Broker Partners