[EXPIRED] Surf City Bridge Restricted Openings February 22-24, 2015, AICW Statute Mile 261
With a closed vertical clearance of 12ft, Surf City ‘“ S.R. 50 Swing Bridge crosses the Waterway at Statute Mile 261, southwest of unlighted daybeacon #69.
NC ‘“ ATLANTIC INTRACOASTAL WATERWAY ‘“ BRIDGE REPAIRS
Mariners are advised to take caution and proceed slowly when approaching the NC Route 50-210 Highway Bridge, located on AICW, mile 260.7, in Surf City, NC. Work crews and barges may be in the waterway conducting repairs to submarine cables and terminals. To facilitate the necessary repairs the bridge will be closed to navigation from 6 p.m. on February 22, 2015 to 6 p.m. February 24, 2015, except for two openings at 10 a.m. and 3 p.m. each day. The channel shall remain open to navigation for vessels that can clear the 12 feet of vertical clearance in the closed position. Chart 11541. LNM:50/14
Click Here To View the North Carolina Cruisers’ Net Bridge Directory Listing For Surf City Bridge
Click Here To Open A Chart View Window, Zoomed To the Location of Surf City Bridge
Be the first to comment!