[EXPIRED] LNM: Special Openings, Nov 5-9 and 12-16, Musson/Coronado Beach Bridge, FL AICW Statute Mile 845
With a closed vertical clearance of 24ft (reduced to 21ft during this maintenance), Coronado Beach Bridge crosses the Waterway in New Smyrna Beach.
FLORIDA – ATLANTIC INTRACOASTAL WATERWAY – TOLOMATO RIVER TO PALM SHORES – GEORGE MUSSON/CORONADO
BEACH/NORTH CSWY (SR44) BRIDGE: Special Regulation/Bridge Repairs
Starting on November 5-9, 2018 (Monday – Friday) and November 12-16 2018 (Monday – Friday) during daytime hours the bridge will be allowed to remain closed between 7am – 7 pm for painting. The bridge will open every three hours at 7am, 10am, 1pm, 4pm and 7pm. – with a one hour notice. During this period, the bridge will operate on it’s normal schedule from 7 pm to 7am.The current TD published for nighttime closure will be suspended during that time period.
Chart 11485 LNM 44/18
Click Here To Open A Chart View Window Zoomed To the Location of Coronado Beach Bridge
Be the first to comment!