LNM: AICW MM 20.2 REMINDER Adjusted Bridge Opening, North Landing Bridge, VA
With a closed vertical clearance of 6ft, North Landing Bridge crosses the Waterway south of Great Bridge Lock.
Sector Virginia (757) 374-3408 MSIB 188-24 May 10, 2024
Albemarle and Chesapeake Canal – North Landing Bridge – Adjusted Bridge Openings Effective immediately, the North Landing Bridge, Mile Marker 20.2 on the Atlantic Intracoastal Waterway, continues to have an adjusted operating schedule due to on-going mechanical issues. The north (Virginia Beach) span will open on schedule on the hour and half hour from 0600-1900 and on demand from 1900-0600. This single, north span opening limits passage to vessels 35 feet in width or less. In order to accommodate vessels and vessels over 35 feet in width, both spans will open on request to the tender. For all other vessels which cannot transit the single span safely, both spans are scheduled to open at 10:00 a.m. each day. The bridge operator can be contacted on VHF-FM Channel 13 or (757) 482-3081. For any questions on the above deviation please contact the U.S. Coast Guard Waterways Management Division via email at VirginiaWaterways@uscg.mil.
|
Click Here To View the VA to NC Cruisers Net Bridge Directory Listing For North Landing Bridge
Click Here To Open A Chart View Window Zoomed To the Location of North Landing Bridge
Be the first to comment!