Jordan Bridge Operation Regulations Removed (Statute Uile 2.8)
Effective October 15,2009, mariners are advised that the Coast Guard has removed the drawbridge operation regulations for the Jordan (S337) Bridge, at AIWW mile 2.8, across the Southern Branch of the Elizabeth River in Chesapeake VA. Since the vertical-lift span of the bridge was removed on May 6, 2009, a special operating regulation for a movable bridge is unnecessary. A copy of the Docket USCG-2009-0814 published in the Federal Register on October 15,2009, as a final rule isincluded as enclosure (1) to this notice.
Be the first to comment!