LNM: AICW MM 2.6 Request for Comment, Belt Line RR Bridge, Elizabeth River, VA
Comments due by Dec 26th.
Sector Virginia (757) 374-3408 MSIB 294-24 December 18, 2024
Elizabeth River – Belt Line Bridge Deviation – Request for Public Comment The U.S. Coast Guard is requesting public comment on 2 proposed bridge deviations of the Belt Line Bridge over the Elizabeth River Southern Branch, at mile marker 2.6, in Portsmouth, VA to facilitate required track replacement. The work would require the bridge to be maintained in the closed to navigation position during all dates and times listed below. Mariners able to transit the bridge in the closed position would be able to do so at any time. Proposed Dates/Times: Monday January 13, 2025, through Friday January 17, 2025, from 7 a.m. to 7 p.m. each day Monday January 20, 2025, through Friday January 24, 2025, from 8 a.m. to 5 p.m., with a 1-hour opening from noon to 1 p.m. each day.
The bridge would not be able to open for emergencies during these times. At all other times, the drawbridge will operate in accordance with the operating regulations set out in 33CFR117.997(a). Please provide comments by close of business on Thursday December 26, 2024, to the US Coast Guard Waterways Management Division via email at VirginiaWaterways@uscg.mil.
# |
Click Here To View the VA to NC Cruisers Net Bridge Directory Listing For Belt Line RR Bridge
Click Here To Open A Chart View Window, Zoomed To the Location of Belt Line RR Bridge
Be the first to comment!