LNM: AICW MM 470.8 Deviation, Wappoo Creek Bridge, 6:00 AM-12:00 PM, Oct 26, Charleston, SC
Wappoo Creek Bridge with a 33ft closed vertical clearance is south of the Ashley River/ICW intersection in Charleston, SC.
SOUTH CAROLINA – AICW – WAPPOO CREEK – SR 171/700 BRIDGE: Temporary Deviation
South Carolina Department of Transportation (SCDOT) is authorized to temporarily deviate from drawbridge operation regulation 33 CFR 117.911(d) that governs the SR 171/700 (Wappoo Cut) Bridge across the Atlantic Intracoastal Waterway (Wappoo Creek), mile 470.8 at Charleston, South Carolina.
Under this temporary deviation, the SR 171/700 (Wappoo Cut) Bridge is allowed to remain closed to navigation including tugs and tugs with tows, from 6:00 a.m. to 12:00 p.m. on Saturday, October 26, 2024, to facilitate the 2024 James Island Connector 5K and 8K Run. Public Vessels and vessels in emergency situations should be passed at any time. Vessels that may pass through the bridge without an opening may do so at any time. For waterways questions or drawbridge operating issues, contact Sector Charleston Waterways Management Division at charlestonwaterways@uscg.mil or the Sector’s 24-hour Command Center Line at (843) 740-7050. LNM: 23/24
Click Here To View the South Carolina Cruisers Net Bridge Directory Listing For Wappoo Creek Bridge
Click Here To Open A Chart View Window, Zoomed To the Location of Wappoo Creek Bridge
AREA SPONSORING MARINAS
Click Here To Open A Chart View Window, Zoomed To the Location of Charleston Harbor Marina
Click Here To View the South Carolina Cruisers Net Marina Directory Listing For Cooper River Marina
Click Here To Open A Chart View Window, Zoomed To the Location of Cooper River Marina
Be the first to comment!