[EXPIRED] LNM: Elizabeth River (Eastern Branch) RR Bridge Restrictions, June 2-3
 1. MARINERS ARE ADVISED THAT THE U.S. 460/S.R. 337 (BERKLEY) BRIDGE, ACROSS THE ELIZABETH RIVER-EASTERN BRANCH, AT MILE 0.4 IN NORFOLK, VA, WILL BE MAINTAINED IN THE CLOSED-TO-NAVIGATION POSITION TO FACILITATE INSPECTION WORK FROM 8 A.M. TO 5 P.M., ON JUNE 2ND AND JUNE 3RD. A WORKBOAT WITH AN AERIAL BOOM WILL BE IN AND OUT OF THE CHANNEL THROUGHOUT THIS PERIOD AND CAN BE REMOVED FROM THE CHANNEL WITH 15 MINUTES ADVANCED NOTICE. VESSELS ABLE TO PASS THROUGH THE BRIDGE IN THE CLOSED POSITION MAY DO SO AT ANY TIME. THE BRIDGE WILL BE ABLE TO OPEN FOR EMERGENCIES WITH 15 MINUTES NOTICE. THE WORKBOAT CAN BE CONTACTED VIA VHF-FM CHANNEL 13 OR BY CELL PHONE AT (757) 651-2873. MARINERS SHOULD USE CAUTION WHEN TRANSITING THE AREA. CANCEL AT//032100Z JUN 25// |
Click Here To Open A Chart View Window, Zoomed To the Location of the U.S. 460/S.R. 337 (Berkley) Bridge
Be the first to comment!