[EXPIRED] LNM: Emergency Repairs Complete on North Landing Bridge, VA AICW Statute Mile 20.2
See North Landing Bridge Restricted for the original Local Notice. Thank you, Matt the Bridge Tender for these updates.
5/17/19
Verbal from the bridge operator: They have completed most of the repairs to the North Landing Bridge. They will be doing one span openings (38 feet horizontal clearance) and can do 2 span openings (full opening) upon request at any time for larger vessels (e.g. tugs & barges). They expect to complete all repairs Monday morning (20 May) after which all openings should be full openings.
If I see something official from the USCG or USACE I’ll pass it along.
V/R,
Matt – Gilmerton Bridge
MSIB 19-102
May 6, 2019
North Landing Bridge and Atlantic ICW – Update
The U.S. Army Corps of Engineers advises that emergency repairs continue on the North Landing Bridge, mile marker 20.2 on the Atlantic Intracoastal Waterway. The bridge is stated to be open to marine traffic at this phase of repair, but vessel operators are encouraged to coordinate transit with the North Landing Bridge operator via VHF Channel 13 or by calling 757-482-3081. The bridge is closed to road vehicle traffic until 2pm on Tuesday, May 7th.
U.S. Army Corps of Engineers news release:
https://www.nao.usace.army.mil/Media/News-Stories/Article/1837362/north-landing-bridge-closes-for-repairs/
Should you have any questions or concerns regarding this matter, contact United States Coast Guard Sector Hampton Roads Waterways Management Division duty phone at (757) 374-3408 or HamptonRoadsWaterways@uscg.mil
Click Here To View the VA to NC Cruisers Net Bridge Directory Listing For North Landing Bridge
Click Here To Open A Chart View Window, Zoomed To the Location of North Landing Bridge
Be the first to comment!