Southern Boulevard Bridge to be Replaced, AICW Statute Mile 1025
This article by Angel Streeter in the Palm Beach Sun Sentinel outlines plans for a new drawbridge to replace the Southern Boulevard drawbridge, which has a closed vertical clearance of 14ft and crosses the Waterway and southern Lake Worth at Mile 1025 in West Palm Beach. Flagler Memorial Bridge, Royal Park Bridge and Southern Boulevard Bridge always present a challenge to a skipper’s patience if an opening is needed, especially during these continuing periods of construction.
State makes plans to replace Southern Boulevard Bridge in West Palm Beach
By Angel Streeter
Sun Sentinel
Construction on new Southern Boulevard Bridge in West Palm Beach will begin in 2016.
Another drawbridge is coming down in Palm Beach County ‘” but just until its replacement is built.
The Florida Department of Transportation is unveiling its plans for replacing the Southern Boulevard Bridge over the Intracoastal Waterway in West Palm Beach while it’s still in the midst of building the replacement for the Flagler Memorial Bridge. Both bridges connect West Palm Beach to Palm Beach.
This time, the state hopes to avoid the pitfalls that have come with replacing the Flagler bridge. The state transportation department plans to build a temporary bridge to the north of the existing Southern Boulevard bridge to keep traffic moving between the mainland and the island.
Click Here for the rest of the article.
Click Here To Open A Chart View Window, Zoomed To the Location of Flagler Memorial Bridge
Click Here To View the Eastern Florida Cruisers’ Net Bridge Directory Listing For Royal Park Bridge
Click Here To Open A Chart View Window, Zoomed To the Location of Royal Park Bridge
Click Here To Open A Chart View Window, Zoomed To the Location of Southern Boulevard Bridge
Be the first to comment!