[EXPIRED] LNM: AICW MM 2.6 Belt Line RR Bridge Closed to Navigation 8 AM – 4 PM with 2 Scheduled Openings, Nov 18, Norfolk, VA
The Norfolk and Portsmouth Belt Line Railroad Lift Bridge, with a closed vertical clearance of 6ft, crosses the Waterway at MM 2.6, near the community of Chesapeake, VA. There is no alternate route available, so adjust your float plan accordingly.
SEC VA MSIB 398-21 – Elizabeth River – Belt Line Railroad Bridge – Bridge Deviation
Be the first to comment!